I have just the barebones minimum for livewell features. No drain valves, just a tube stuck in the drain hole that needs to be removed to drain the wells. auto/manuel operation switches for either side. I'd like to upgrade it to having a pump out system for better water circulation, and put in a air pump of some sort. Has anyone ever tackled such a project?