Page 1 of 2 12 LastLast
Results 1 to 20 of 39
  1. #1
    Moderator
    Join Date
    Mar 2009
    Location
    Portland, TN
    Posts
    18,121

    25% of my mancave is 80% done

    Here is just a small portion of my mancave (basement). I have so much fishing, hunting, scuba diving, and camping stuff my wife and I decided I needed my own room (I have a good woman). So I converted the bedroom in the basement into my fishing room. I still have to run some trim, reroute the wiring for the lights, paint the floor, and build a rod rack on the wall but that can be done as I get some more time. I hung the drywall, textured it, and then hung metal on the roof. I like how it turned out so far








    Excuse this mess. I am trying to straighten out 50+ years worth of lure making supplies. This little drawer storage was my grandfathers and it is FULL of stuff but it was a mess. I worked on it for 2 hours last night and this is where I got.



    This is just showing the metal on the roof. There is white rust on it as it was underwater for a day or so. I got it free at work

  2. grand bassin Mike.'s Avatar
    Join Date
    Aug 2006
    Location
    Coffeyville, KS
    Posts
    8,807
    #2

    Re: 25% of my mancave is 80% done (RoadrashPaul)

    looking good
    Z521 Ranger - 250 Pro XS
    374V Ranger - 175 Merc Black Max

  3. Winter can end now..... BoatBuggy's Avatar
    Join Date
    Mar 2011
    Location
    St Lawrence Ontario / Sam Rayburn TX
    Posts
    12,829
    #3

    Re: 25% of my mancave is 80% done (RoadrashPaul)

    Looking good!

    2013 Ranger Z520c, 2013 Yamaha 250 SHO
    2018 Ranger Z521c, 2018 Yamaha 250 SHO

  4. Lost in transition BIGCBAG's Avatar
    Join Date
    Dec 2011
    Location
    Janesville Wisconsin
    Posts
    7,033
    #4

    Re: 25% of my mancave is 80% done (RoadrashPaul)

    I'm still trying to figure out the math!

  5. Member
    Join Date
    Nov 2011
    Location
    Coral Springs, Florida
    Posts
    11,937
    #5

    Re: 25% of my mancave is 80% done (BIGCBAG)

    When you get that twenty five percent two hundred percent complete you will be halfway there

  6. Moderator
    Join Date
    Mar 2009
    Location
    Portland, TN
    Posts
    18,121
    #6

    Re: 25% of my mancave is 80% done (NitroZ7)

    This is the other 75% that is only about 10% done




  7. Banned
    Join Date
    Aug 2004
    Location
    Hubbard, Ohio
    Posts
    12,387
    #7

    Re: 25% of my mancave is 80% done (RoadrashPaul)


    would have been easier (and MUCH more understanding to most on here! ) just to say 20% of my mancave is done!




  8. Member MarkNY's Avatar
    Join Date
    Jun 2004
    Location
    Canajoharie
    Posts
    16,730
    #8

    Re: 25% of my mancave is 80% done (RoadrashPaul)

    Ooohhh foosball

  9. Member
    Join Date
    Mar 2011
    Location
    Manakin Sabot
    Posts
    3,898
    #9

    Re: 25% of my mancave is 80% done (RoadrashPaul)

    looks good man!

  10. Member keefus's Avatar
    Join Date
    Nov 2007
    Location
    Williamston, S.C.
    Posts
    12,851
    #10

    Re: 25% of my mancave is 80% done (RoadrashPaul)

    Looking good

  11. Moderator
    Join Date
    Mar 2009
    Location
    Portland, TN
    Posts
    18,121
    #11

    Re: 25% of my mancave is 80% done (OhioChamp183)

    <table width="90%" cellspacing=0 cellpadding=0 align=center><tr><td>Quote, originally posted by OhioChamp183 &raquo;</td></tr><tr><td class="quote">
    would have been easier (and MUCH more understanding to most on here! ) just to say 20% of my mancave is done!
    </td></tr></table>

    But not nearly as fun

  12. Member
    Join Date
    Jan 2010
    Location
    Greenwood
    Posts
    821
    #12

    Re: 25% of my mancave is 80% done (RoadrashPaul)

    Looks good!

  13. Lost in transition BIGCBAG's Avatar
    Join Date
    Dec 2011
    Location
    Janesville Wisconsin
    Posts
    7,033
    #13

    Re: 25% of my mancave is 80% done (RoadrashPaul)

    [quote=RoadrashPaul]This is the other 75% that is only about 10% done

    Ok now 25% of 80% is done.....Now you say the other 75% is 10% done.....So 10% of the...(edit) ME!!!!! I'm done!!!!

    Enjoy your man cave

  14. Member haveme1's Avatar
    Join Date
    Apr 2009
    Location
    Mint Hill NC
    Posts
    20,786
    #14

    Re: 25% of my mancave is 80% done (BIGCBAG)



    Priorities !
    **
    Life is kinda hard but it's
    better than the other options .. er ..option !

  15. Iowa/Wisconsin/Hunting & Gun Lodge/Stroker Moderator Wags's Avatar
    Join Date
    Jun 2004
    Location
    Camanche Iowa
    Posts
    13,654
    #15

    Re: 25% of my mancave is 80% done (haveme1)

    Paul it looks good
    LeaLea

  16. Member
    Join Date
    Jul 2004
    Location
    Somewhere in Mississippi
    Posts
    2,766
    #16

    Re: 25% of my mancave is 80% done (Wags186)

    I guess the desk is the place where you are going to show us how you built your smoker. No rush Paul I just had to say something. Looks great.

  17. Moderator
    Join Date
    Mar 2009
    Location
    Portland, TN
    Posts
    18,121
    #17

    Re: 25% of my mancave is 80% done (GRANDPAOF7)

    <table width="90%" cellspacing=0 cellpadding=0 align=center><tr><td>Quote, originally posted by GRANDPAOF7 &raquo;</td></tr><tr><td class="quote">I guess the desk is the place where you are going to show us how you built your smoker. No rush Paul I just had to say something. Looks great.</td></tr></table>

    When I get home from work it is dark

  18. Member
    Join Date
    Jun 2011
    Location
    Moyock, NC (USA)
    Posts
    2,177
    #18

    Re: 25% of my mancave is 80% done (RoadrashPaul)

    Dude,

    I was going to give you a hard time about the math but I saw that workbench with the ventihood and I fell in love! What an awesome idea!!!
    Buddy Webster USN(retired)

    2007 Triton TR-196 w/200 Optimax
    2018 Chevrolet Silverado LTZ 6.2 4x4
    2003 Jeep Rubicon
    http://www.bbcboards.net/swap-sell/

  19. Moderator
    Join Date
    Mar 2009
    Location
    Portland, TN
    Posts
    18,121
    #19

    Re: 25% of my mancave is 80% done (SSNCHIEF)

    <table width="90%" cellspacing=0 cellpadding=0 align=center><tr><td>Quote, originally posted by SSNCHIEF &raquo;</td></tr><tr><td class="quote">Dude,

    I was going to give you a hard time about the math but I saw that workbench with the ventihood and I fell in love! What an awesome idea!!! </td></tr></table>

    Nothing wrong with the math

    I can't take credit for the hood. My dad actually made me that for me to airbrush baits under. I think he got the idea off another website. It works great. Turn on the light to see well. The fan doesn't do much but I only use waterbased paints anyway so there is almost no smell.

  20. Banned
    Join Date
    Mar 2009
    Location
    Narrows, VA
    Posts
    5,388
    #20

    Re: 25% of my mancave is 80% done (RoadrashPaul)

    Looks good Paul

Page 1 of 2 12 LastLast

Similar Threads

  1. ManCave/Garage
    By jseasor in forum Home Improvements
    Replies: 6
    Last Post: 02-15-2011, 11:40 AM