Results 1 to 5 of 5
  1. #1
    Member
    Join Date
    Jun 2004
    Location
    Eagan, MN
    Posts
    668

    Current Build Time for a new Ranger?

    Does anyone know the current build wait time for a new Ranger 519 cup edition? My dealer is closed the rest of the week. I will call them next week but checking to see if anyone knows. Thanks.
    2014 Ranger Z119C 225 Pro XS

  2. Member
    Join Date
    Aug 2013
    Location
    Raleigh, NC
    Posts
    1,401
    #2
    I heard 12 weeks. Plus I believe the plant shuts down for 1 or 2 weeks during Christmas.
    2023 Ranger Z520R - Mercury ProXS 250 HP
    Collins Boating Pro Staff - Smithfield, North Carolina
    JeffreyDavisFishing.com
    | YouTube | Facebook | Instagram | NC Bass Challenge


  3. Member
    Join Date
    Apr 2014
    Location
    SW, Ohio
    Posts
    17,190
    #3
    mine was 4 months ordered april picked up in august
    2022 z519 cup 225 merc 4s ser # 3B210484. 2--hds12 live units. 2 poles, atlas plate, ghost, hamby's, active target, merc digital gauges
    2002 basscat pantera 3 (dad bought new) sold 8-2-22
    2000 stratos 20 ss (bought new) 200 hp Rude ficht great boat/motor sold 11-21
    pulled by a 2500HD Denali
    proud dad of an ARMY Captain
    MAGA
    ASE/GM Master tech before tools

  4. Ranger Boats Moderator jc2bg's Avatar
    Join Date
    Sep 2009
    Location
    Findlay, Ohio
    Posts
    12,932
    #4
    12 weeks is about right, keeping in mind [as mentioned above] down time for holidays. There are generally a lot of orders placed right after the first of the year—boat shows.
    John Clark — Findlay, Ohio

  5. Member
    Join Date
    May 2012
    Location
    WI
    Posts
    1,022
    #5
    I was told 12 as well. My dealer put the order in a few weeks ago.
    2023 Ranger 521R DC
    Mercury 250 Pro XS 4S