After months of research, IM's to Bird owners and a trip to the Phoenix factory I finally ordered my 721. I expect my wait to be 12 to 16 weeks minimum. Hopefully Yamaha will be able to ramp back up on SHO production. Thanks to everyone for their help and emails.
She is gonna be loaded up! The only option I am still thinking about is a 10" Atlas plate.