I have a fishing trip coming up where I am leaving next weekend and I should be getting my boat back from the shop mid next week and I have three boat DIY projects to the boat that I need to get done before we leave. I am absolutely horrible with estimating how longs things take and I always get frustrated because they take longer than I anticipate. I have all day next Friday to complete these but maybe someone can give me some realistic time frames from experience on how long each one of these projects should take. I dont think it matters but the boat is a 05 Triton TR21x

1. Install/Replace a four bank charger.
2. Install a Hambys/Keelshield
3. Install a new ram mount for a depth finder and run a power cable to the battery transducer is already in place.