**
Life is kinda hard but it's
better than the other options .. er ..option !
Are they smoking crack?!?! Open by May 27th?!?!
You can't build a bridge that dang fast.
I guess there is an old one somewhere that they are modifying to fit?
This I gotta see this........
and geez, look at the bids!
$7.0 million - Hall Contracting, Louisville, KY
$11.2 million - Walsh Contracting, of Crown Point, Ind
$11.4 million - C.J. Mahan, of Grove City, Ohio
Hall left $4.2 million on the table......I wonder what the difference was in the bids for the other two to be so close and then Hall just blowing them away?
There's a lot you can do with $4.2 million![]()
werent they supposed to be replacing the bridge anyway????
they will probably prefab the section and bring it in and install with cranes. i guess thats how they could do it that fast. jmo.
Ranger Forever![]()
<table width="90%" cellspacing=0 cellpadding=0 align=center><tr><td>Quote, originally posted by artcarney_agr »</td></tr><tr><td class="quote">Are they smoking crack?!?! Open by May 27th?!?!
You can't build a bridge that dang fast.
I guess there is an old one somewhere that they are modifying to fit?
This I gotta see this........
and geez, look at the bids!
$7.0 million - Hall Contracting, Louisville, KY
$11.2 million - Walsh Contracting, of Crown Point, Ind
$11.4 million - C.J. Mahan, of Grove City, Ohio
Hall left $4.2 million on the table......I wonder what the difference was in the bids for the other two to be so close and then Hall just blowing them away?
There's a lot you can do with $4.2 million![]()
</td></tr></table>
Imported welders ??????
Daiwa / St. Croix / Abu Garcia / Sufix / Humminbird / Motorguide
T & H / Power Pole / BlueWater / Loc-R-Bar / Bravo 1 / MercMonitor
Maybe they could use Lego's for the price.
That's great. Now we can drive across a old POS bridge with bandaids on it. Just what I wanna do.![]()
![]()
<table width="90%" cellspacing=0 cellpadding=0 align=center><tr><td>Quote, originally posted by barkleyhawggitter »</td></tr><tr><td class="quote">they will probably prefab the section and bring it in and install with cranes</td></tr></table>
I'm sure they'll build it on the bank or on a barge and float it in like they're doing at Milton/Madison, but heck that will take longer than 80 days!
If they started tomorrow, that is exactly 80 days until May 27th.......that's crazy!!!
![]()
They meant May 27th of 2013.![]()
![]()
![]()
![]()
![]()
![]()
![]()
<u>1999 TR-21PD / 1999 Mercury 225 Optimax</u>
<table width="90%" cellspacing=0 cellpadding=0 align=center><tr><td>Quote, originally posted by runngunn »</td></tr><tr><td class="quote">They meant May 27th of 2013.![]()
![]()
</td></tr></table>
Now that would be more accurate, but they need to clarify that! People are going crazy with excitement thinking that it will be open this summer!![]()
You figure someone went and measured the section of old Paris landing bridge sitting on the bank at the marina there and thought it would fit,![]()
Majek Reaper
Flashed SHO
Anderson Services LLC
" Those who beat their swords into plowshares will plow for those who don't"
How Shallow can you Run?
<table width="90%" cellspacing=0 cellpadding=0 align=center><tr><td>Quote, originally posted by TRCM »</td></tr><tr><td class="quote">
Imported welders ??????</td></tr></table>
The higher bids were with union workers![]()
<table width="90%" cellspacing=0 cellpadding=0 align=center><tr><td>Quote, originally posted by artcarney_agr »</td></tr><tr><td class="quote">
I'm sure they'll build it on the bank or on a barge and float it in like they're doing at Milton/Madison, but heck that will take longer than 80 days!
If they started tomorrow, that is exactly 80 days until May 27th.......that's crazy!!!
</td></tr></table>
You would be suprized at what can be done"And done correctly" in a limited amount of time.
Next time you turn your lights on at your house remember that at one time, I said we cant have those circulators finished in 3 weekswell low and behold they were and they were done right
![]()
2022 Xpress H17 - Yamaha SHO 90