Transom , and stringers almost done.. If I can the only thing left will be the foam and the floor come Monday , at least on the inside of the boat
http://i29.photobucket.com/albums/c2...P1010002-8.jpg
Printable View
Transom , and stringers almost done.. If I can the only thing left will be the foam and the floor come Monday , at least on the inside of the boat
http://i29.photobucket.com/albums/c2...P1010002-8.jpg
Well didn't go as planned .. its now Tuesday Had to work over time Thur, Fri, and Monday.. and I just got the middle stringer glassed it, and tabbed, will finish the glass on the middle stringer tomorrow if it don't pour down rain http://www.bassboatcentral.com/smileys/praying.gif . And the transom supports finished I hope. Then All will be left is a little foam, and put the floor back in and reattach the top, then the cosmetic work begins