Results 1 to 9 of 9
  1. #1
    Member Rick James's Avatar
    Join Date
    May 2011
    Location
    West Central, IL
    Posts
    374

    Number of labor hours to install Hydrotec Phase 2?

    Anyone get the Phase 2 kit installed locally that can share the number of hours it took to have the setup installed?
    ~Matt Miller
    23’ Phoenix 21 PHX - 250 ProXS

  2. Member
    Join Date
    Apr 2013
    Location
    Wisconsin
    Posts
    116
    #2
    i installed a phase 2 kit on an OX66 myself and it took me about 4 hours.

  3. Member
    Join Date
    Mar 2017
    Location
    Georgetown, TX
    Posts
    767
    #3
    Quote Originally Posted by Bassasassin920 View Post
    i installed a phase 2 kit on an OX66 myself and it took me about 4 hours.
    225? Can you share your thoughts after the installation? I'm thinking about one over the winter.

  4. Member
    Join Date
    Apr 2013
    Location
    Wisconsin
    Posts
    116
    #4
    I had a 19' Skeeter with a 200 HP OX66 on it. It was definitely a noticeable difference. Primarily on the bottom end (out of the hole). Increased the throttle response substantially from bottom through the top of the rpm range. Top end was probably 1-3 mph depending on conditions obviously. I now have a 20' Skeeter with a 225 SHO. But if I ever had another OX66 I'd buy the phase 2 kit and install it again.

  5. Member
    Join Date
    Mar 2017
    Location
    Georgetown, TX
    Posts
    767
    #5
    Anybody know how much they are milling heads for this kit? Isn't that all that's done? I didn't think they were producing an aftermarket piece. Shave .030-.040, add the exhaust tuner and a set of reeds, one might be on to something without the cost of heads.
    Last edited by ClarkBird; 07-31-2017 at 05:06 PM.

  6. #6
    Quote Originally Posted by ClarkBird View Post
    Anybody know how much they are milling heads for this kit? Isn't that all that's done? I didn't think they were producing an aftermarket piece. Shave .030-.040, add the exhaust tuner and a set of reeds, one might be on to something without the cost of heads.
    4 hours on a Phase I and 6 to 8 hours on the Phase II.

    Phase I kit is heads, carbon reeds, and all the gaskets
    Phase II is heads, carbon reeds, tuner, solid mounts, and all the gaskets

  7. Member
    Join Date
    Mar 2017
    Location
    Georgetown, TX
    Posts
    767
    #7
    Thanks, Wayne. Approx hp increase on 225 w/ PhII?

  8. #8
    Quote Originally Posted by ClarkBird View Post
    Thanks, Wayne. Approx hp increase on 225 w/ PhII?
    50hp with Phase II
    35hp with Phase I

  9. Member
    Join Date
    Mar 2017
    Location
    Georgetown, TX
    Posts
    767
    #9
    Ordered the kit today.
    Lake&Bay Boca
    SHO