Dropped the hammer today on a 2022 P2. I made the mistake of getting rid of my last one, I will not do that again. But for a person with zero patience, this will be the longest 4-5 months of my life.
Dropped the hammer today on a 2022 P2. I made the mistake of getting rid of my last one, I will not do that again. But for a person with zero patience, this will be the longest 4-5 months of my life.
2022 Basscat PII
Mercury 200 Pro XS 4stroke
So, you're saying I can put my future boat in my Sig?
Congrats and good luck.
"the head, the tail, the whole damn thing"
Moral of this story is don't get rid of your boat until your new one is ready for delivery
How do you know it's going to be 4-5 months? Guys on here have been waiting since November for there rig.
I waited for a custom ordered F350 King Ranch in 2015. It was a hard 8 week wait. Waiting half a year would be rough for sure, but the wait will be worth it to get exactly what you want. Congrats.
2017 Bass Cat Phelix Honda 25 SOLD
2007 BCB Cougar FTD Merc Opti 225 SOLD
Instagram: @SSgt93.
I don't subscribe to threads. PM if you need me.
Presently that is the existing time line for maximum build time. We do not control Humminbird, Mercury, Yamaha and other vendor items we simply buy and install. Demand is up and demand for our products is up further than many in comparison to our production ability now.
2016 BassCat Pantera II
Mercury 200 ProXs
I work at Miller's Boating Center, you don't want to know some of the motor delays we are seeing for repowers. Some Humminnbird stuff is starting to trickle in. Raptors and trolling motors are still a problem though.
Brad Krone
2022 Basscat PII
Mercury 200 Pro XS 4stroke
I ordered a P2 on March 3rd and my dealer still has no estimate as to when it may start being built.
Unfortunately that is common place in the marine industry. We just placed an order for a 300hp Yamaha for a customer's saltwater boat. We were told by Yamaha an estimated date of June 2022. Most of the boat brands we carry are not giving build/delivery times these days. This is due to parts and material shortages. Some companies also told us they are having a hard time with staffing.
Brad Krone