Installing mega 360 active target MDI transducer and also have built in us2 transducer on my ultrex. The us2 cable is ran thru clamshell with trolling motor wire but may only be able to put one more cable thru it. What's the best way to get the other cables under the bow? Should I drill another hole beside the one that's already there and install another clamshell or what suggestions are out there?

Thanks!