Has anyone reconfigured their wiring setup in the bilge area? I'm not crazy about having the breakers and a bunch of wires on the cranking battery. Ideally I'd like to add another bus to clean up the top of the battery and add battery shut off switches for both the cranking and TM batteries. The shutoffs should be installed in a singular easy to reach location. Any help would be appreciated.