Started some work on me and my brother’s 2000 518vx today. Just got it Sunday. Have a lot to do but I’m game. Made the garage a little bigger to accommodate her wide behind lol. Then started some bow work so I can start installing my Ultrex after I order a 1” spacer. Old bow padding was shot, wouldn’t let a hobo piss on it. Used Gatorskinz. Took longer than I thought. A lot of heat gun, pulling, razoring, goo gone, and cussing. Why do the smallest projects take the longest and hurt the worst lol.