A quick update showing the build up of the Pad. The first shot shows the Stbd side edge. The 5 degree transition angle from the hull was maintained. The second shot shows just how much the original Pad was built up to maintain the Pad all the way back. The third shot you can see how straight the lines are, didn't start out that way. It is close enough now that after laminating a single layer of finish glass over everything and skimming once I can finish with Duratec VE Primer. It would need a couple of heavy coats, block sanding between coats to have it perfect. I am at a point of diminishing returns due to operating speeds the boat will run. Low 50's is anticipated. I don't plan on removing the 90 Etec once installed.
Pad Buildup 1.jpgPad Buildup 2.jpgPad Buildup 3.jpg